INTEGRATED SOLUTIONS, INC.

TESTING PROCESS

 

 

 

Prepared By:

 

 

Lead Author, Integrated Solutions

Date

 

 

 

 

 

APPROVED BY & AFFECTIVE ON DATE OF SIGNATURE BELOW:

 

 

Yufen Chang Yu, Integrated Solutions

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THIS DOCUMENT IS TO BE REGARDED AS THE official QUALITY SYSTEMS AUDIT PROCESS within Integrated Solutions.  IT IS TO BE MAINTAINED UNDER CHANGE CONTROL BY the document control coordinator.

 

 

 

 

 

 

 

 

 


 

 

 

CHANGE SHEET

TITLE: Integrated Solutions Testing Process

DESCRIPTION OF CHANGE

ISSUE

DATE

SECTION

DESCRIPTION

1.0

 

2.0

 

 

 

 

3.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8/5/97

 

6/20/2000

 

 

 

 

5/15/2006

All

 

All

 

 

 

 

All

Original issue

 

Clearly defined Test Plan Review & Testing Review Components

Created a Flowchart of the entire Testing Process.

Added information pertaining to Authors, Reviewers, Testers and Facilitators.

Added Templates for reference

Modified the documentation to better reflect the company’s current practice of software testing processing.

 

 

 

1.0             INTRODUCTION

 

This documentation provides the general guidance that is to be followed in the process of software testing.

2.0             Testing Process

 

·        Assign designated personnel as the tester(s) and reviewer(s) who are responsible for the testing.

·        Tester(s) obtain product requirements documentation, read it and understand the product, and raise issues or questions if any.

·        Tester(s) obtain test documentation template, write test plan or test cases according to the requirement specifications. All test plan or test cases must be documented electronically and be tractable.

·        Reviewer(s) are called to review the test plan or test cases; tester(s) update the test plan or test cases if necessary.

·        Check and make sure the testing environment is set up correctly according to the requirements.

·        Entrance Criteria: After all the above steps have been completed, proceed to start the actual software testing.

·        Tester(s) update test cases report as testing moves on case by case, following the test case template.

·        Tester(s) feedback test results to the development team.  The development team will work on those failure cases.  Re-test is required on all test cases with special focus on those failure ones.

·        Exit Criteria:  After all parts of the test plan or test cases have been walked through and all issues have been raised, documented and addressed.

3.0             Area of Considerations

 

These are the items that a tester or a reviewer should be considering while going through the testing process.

 

·        Release description

·        Test deliverable

·        Schedules

·        Required resources

·        Responsibilities

·        Areas to be tested

·        Test approach