DOCUMENTATION CONTROL PROCEDURE

 

 

 

 

Prepared By:

 

 

Lead Author, Integrated Solutions

Date

 

 

 

 

 

 

 

Approved by & Effective on Date of Signature below:

 

 

Yufen Chang Yu, Integrated Solutions

Date

 

 

 

 

 

                                                                                                                                                                                   

 

 

 

THIS DOCUMENT is to be regarded as the official document control Procedure within integrated solutions.  it is to be maintained under change Control by the document control coordinator.

 

 

 


 

 


 

CHANGE SHEET

 

TITLE: Documentation control procedure

 

DESCRIPTION OF CHANGE

ISSUE

DATE

SECTION

DESCRIPTION

1.0

 

1.1

 

1.2

 

1.3

 

2.0

 

 

 

 

 

 

2.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2/27/97

 

9/6/97

 

2/15/02

 

7/19/04

 

3/31/05

 

 

 

 

 

 

6/30/05

All

 

Footers

 

Appendix A

 

Appendix A

 

Section 4.1 Appendix B

 

 

 

 

 

Section 4.1

 

 

 

Appendix B

¡P Original Issue.

 

¡P        Unique Identifiers corrected on footers

 

¡P        Updated document matrix.

 

¡P        Updated document matrix.

 

¡P        Adding statement of using Document Submission Checklist, appendix B, in section 4.1.

¡P        Revising cover page to include approval signature; remove the requirement of approval signature page.

 

¡P        Making provision and verification of consistent dates/versions the responsibility of the document owner and document owner respectively.

¡P        Sign-off is no longer required of using the document submission checklist;


TABLE OF CONTENTS

 

1.0    PURPOSE................................................................................................. 4

2.0    POLICY..................................................................................................... 4

3.0    DEFINITIONS............................................................................................. 4

4.0    documentation guidelines............................................................... 5

4.1      General Requirements............................................................................................................................. 5

4.2      Exceptions to General Guidelines........................................................................................................ 6

5.0    Document creation and submission............................................... 6

5.1      Development Document Procedures..................................................................................................... 6

5.2      Quality Documentation............................................................................................................................ 8

6.0    Documentation Control................................................................... 9

6.1      Development Document Control........................................................................................................... 9

6.2      Quality Documentation System........................................................................................................... 10

6.3      Externally Generated Documents....................................................................................................... 10

6.4      Control of Miscellaneous Administrative Documents................................................................... 10

7.0    Revision (Issue) Control.................................................................. 10

7.1      Documents in review.............................................................................................................................. 10

7.2      Revision level Controlled Documentation........................................................................................ 10

7.3      Date Controlled Documentation......................................................................................................... 11

8.0    obsolete documentation............................................................... 11

8.1      Obsolete Development Documentation.............................................................................................. 11

8.2      Obsolete Quality Documentation........................................................................................................ 12

8.3      Obsolete Administrative Documentation.......................................................................................... 12

8.4      Document Disposal................................................................................................................................. 12


1.0       PURPOSE

The Integrated Solutions Documentation Control Procedure governs the control, distribution, and removal of documentation.  It applies to both hard copy and electronic forms of documentation.

 

The purpose of this procedure is to:

    establish a uniform and consistent method for the preparation and handling of documentation.

    promote consistent document management across Integrated Solutions.

    facilitate distribution of released development related documentation.

    provide an accurate historical record and archive of all Integrated Solutions documentation.

    specify who controls documentation.

    identify the location of the controlled copies of documentation.

2.0       POLICY

            Refer to ¡§Document Control Policy¡¨, 4-001-PC-000-2.1

3.0       DEFINITIONS

 

Agent:  A person, other than an author or originator, designated as responsible for managing the document through the Document Control process and securing the necessary concurrence and approvals.

 

Preparer:  The person creating or publishing a document.

 

Change Control:  A coordination, tracking and evaluation activity using input provided from various sources on the content, clarity, and accuracy of product or development documentation for which Integrated Solutions is responsible.

 

Document:  Any written or electronically input conveyance of information leading to, required by, impacting upon, or pertaining to a Integrated Solutions development program or activity.

 

Editorial Changes: Any change that does not add information to, delete information from, or change the meaning or interpretation of the material, maybe considered an editorial change.

 

Externally Generated Documentation:  A category of documentation produced by other companies or individuals outside of  Integrated Solutions including but not limited to:            Customer Documentation

          Engineering Standards

          Corporate Policies (i.e., Operations, Financial, Human Resources)

 

Form:   A document with blanks for the insertion of details or information.

 

Guide/Manual:   A reference or instruction document.  All guides and manuals are considered local practices.

Internally Generated Documentation: A Category of documentation produced by Integrated Solutions employees including but not limited to:

          Product Realization Process Documentation

          Quality Documentation

          End User Documentation

 

Local Practices:  A process, procedure, or set of instructions that apply to either a single functional area (i.e. engineering, , etc.) or a single job task or set of tasks (i.e. librarian).  Local practices detail the information necessary to complete tasks that are not completed by other functional areas in the organization or tasks that are job specific within a functional area.

 

Miscellaneous Administrative Information:  A category of documentation containing information that must be revision controlled including but not limited to:

 

          Organizational Charts

          Job Descriptions

          Indexes

 

Original Issue: The first time a particular document is released.

 

Author: The person authoring or designated by a team of  document authors as the focal point of documentation coordination, modification and issue resolution.  This is the person who is responsible for managing the document through the review process and securing the necessary concurrence and approvals.

 

Process:  A system of operations that describes the production of something.  A process has three main components:  inputs, throughputs, and outputs.  Inputs describe the initial triggers and/or elements necessary to conduct a series of actions, changes, or functions (throughputs) that bring about an end result (outputs).  A process either spans several functional organizations or can be used by more than one functional organization.  It is repeatable and measurable; corrective action is used to correct systematic process problems and improve process performance.

 

Procedure:  A set of established steps, methods, or actions that describe how to perform, effect, or conduct an act of business.  A procedure either spans several functional organizations or can be used by more than one functional organization.  It is repeatable and measurable; corrective action is used to correct procedure problems and improve procedure performance.

 

Review: The means and process by which documents are evaluated for correctness and  General Documentation Guidelines completeness inclusive of the feedback comments, criticisms and recommendations.

 

Issue:  Any substantive change in the  contents of an already released document.

4.0       documentation guidelines

4.1       General Requirements

Except as noted elsewhere in this document, all documents created within Integrated Solutions and placed under revision control shall include a Document Cover Page, one or more Change Sheets and a Control Footer on every page following the title page.  Depending on its length and intended use the author of the document may include a table of contents, an index or other aids to the reader/user of the document.

 

Document Cover Page - Each document type has a unique cover page. It serves as a title page. The cover page always includes the title of the document, the uniquely assigned document number for the document, the revision level of the document, the date of creation of the document and approval signature. Appropriate signatures are obtained by the "owner" of the document before it is submitted to the document control authority.

 

Document Change Sheet - The Change Page or pages immediately follow the Document Cover Page. They serve as a running log of the revisions which have been made to the document over time.  The change page includes the document title, the control footer, and a chronological listing of revisions made to the document.  Each entry in the list includes:

    Revision level

    Date of  revision

    Identification of the section changed

    Description of the change.  This includes the reason for the change and the specific changes made.

 

Document Control Footer - The footer of each page after the signature page contains the following:

    Document control number

    Appropriate revision number

    Page number

    Date (of most recent document revision)

    The appropriate confidentiality legend

 

Forms are operating tools for Integrated Solutions.  They do not change on a regular basis and therefore are only required to have a unique document number and a revision level. Document Cover Pages, Signature Pages, Change Sheets and footers are not needed for forms.

 

Upon approval and before submitting to document coordinator, it is document owner¡¦s responsibility to provide consistent document number or revision number and date in the document. Document coordinator need to verify the consistence of date/versions before issue. Document Submission Checklist, Appendix-B,  is provided, without requirement of sign-off, to both document owner and document coordinator for merely purpose of checking.

4.2       Exceptions to General Guidelines

There may be times when a customer (internal or external) will require a modification to the footer on joint documents.  The Document Control Coordinator has the authority to grant modifications of the footer.

5.0       Document creation and submission

5.1       Development Document Procedures

All development documents fall into one of the two categories listed:

 

    Released Development Documents- These documents are to be released to Document Control (DC) immediately upon approval.

    Development Program/Project Notebooks-This compilation of development related documents and notes submitted to DC upon completion of the development program.

5.1.1     Procedures for Obtaining a Document Number

 

For all controlled documents, the DC generates the unique number using the documentation identification number format below. The DC references the Master List of Controlled Documents to verify that the number is unique. The DC updates the Master List of Controlled Documents with the document ID Number, issue number, document title, author(s), and date. The DC notifies the author of the document number and updates the Master List of Controlled Documents.

 

Document No: A-BBB-CC-DDD-XX.Y

 

A is the Area identifier code and defined as follows:

Area 1: Business Process

Area 2: Design and Development

Area 3: Support and Troubleshooting

Area 4: Operations

Area 5: Administration

Area 6: Quality

 

BBB indicates the sequence number in that area.

 

CC indicates the type of document it is. The following types are reserved as follows:

 

                        AR = Architecture

                        BC = Business Case

                        CS = Customer Specification

                        DD = Detaile